Start Slideshow
House #5 Renovation - HBB -Tsiko, Togo - Feb 2020
25 photos
-
#1 Foundation for the Addition
-
#2 Backfill Completed in the Addition
-
#3 Concrete Floor in the Addition
-
#4 Block Walls & Window Frames
-
#5 More Blocks, Windows & Electrical Conduit
-
#6 Exterior Walls & Windows (Except Front Wall)
-
#7 Part of the Old Roof Removed
-
#8 The Old Gable End Being Torn Down
-
#9 The Old Gable End Down & Cleaned Up
-
#10 The Old Windows Reset in the Front Wall
-
#11 The New Gable End on the Main House
-
#12 The New Gable End on the Back Addition
-
#13 Kitchen Cabinets (Outside Wall) Termite Infested
-
#14 Old Cabinets Out - Ready for New Ones
-
#15 The Old Roof Going
-
#16 The Old Roof Gone
-
#17 New Steel Truss Coming
-
#18 New Trusses (Main House) Installed
-
#19 Purlins Welded to the Trusses
-
#20 New Roof on the Front Side
-
#21 Trusses, Rafters & Some Roofing on the Addition
-
#22 Valley Framing Installed
-
#23 Valley Flashing Instlalled
-
#24 Valley Flashing on Both Valleys
-
#25 The House - when I left to go home - Still a lot to be done!