Water Tank Project - HOH - Mango, Togo - Oct 2019
25 photos
-
#1 Jobsite Prepared & Ready
-
#2 Water Tank Base Poured
-
#3 Outlet & Drain Lines Installed
-
#4 Drain Line Extended
-
#5 Water Tank Taking Shape
-
#6 Sifting Sand for Mortar
-
#7 Mixing Concrete to Fill Block Cores
-
#8 Block Work Finished
-
#9 Plastering the Inside Walls
-
#10 More Inside Walls Plastered
-
#11 Build Wood 'Saddles' for the Scaffolding
-
#12 Scaffolding (with Saddles) & Joists in the Tank
-
#13 Scaffolding & Joists Set in One Side
-
#14 Scaffolding in the Other Side Too
-
#15 Plastering on the Outside Walls
-
#16 Plywood Decking for Concrete Top with Access to Inside
-
#17 Most of the Decking for the Concrete Lid
-
#18 Forms on Outside Edge of Tank Top
-
#19 Outside Forms Anchored to Rebar in Cores
-
#20 Forms around Access Holes in Water Tank Top
-
#21 Top Formed with Double Steel Mat Reinforcing
-
#22 Mixing the Concrete for the Top
-
#23 Pouring the Concrete Top
-
#24 Masons Finishing the Concrete Top
-
#25 Bill - on the Jobsite